Site icon Kirklees Together

Details of our resurfacing works for summer 2025

Surface Dressing

Surface dressing is due to take place at over 60 sites across Kirklees this the summer.

Highways inspections have identified priority roads across the district that require surface dressing, a long-term preventative treatment that stops water getting below the surface of the road and prolongs the life of the highway for up to 10 years. The treatment seals and improves the surface texture. It’s an efficient, effective and economic method that reduces long-term disruption and keeps our highway networks on the move.

Councillor Tyler Hawkins, Cabinet Member for Highways and Waste said:

“Residents often approach Councillors to discuss the state of the roads in Kirklees. Whilst we’re not able to resurface every road in the district, we have prioritised those which have been waiting the longest or are on busier routes in urgent need of repair.

“We are dedicated to investing in our highways network, improving our roads and keeping people on the move, supporting safer smoother journeys for all, whether that’s on public transport, bicycle or motor vehicle within our limited available budgets.

“I understand roadworks can be frustrating, but we aim to keep disruption to a minimum and I would like to thank everyone in advance, for their patience.”

Traffic management

For work to be carried out safely and efficiently, some roads will be closed whilst the process takes place. Details of road closures and diversions are on one.network. Once completed, the road will be reopened with traffic calming measures until the aggregate chippings are embedded.

Throughout the works, manhole covers, and rainwater gullies may be adjusted, and road markings will be replaced at a later date.

Roads included in the programme

Roads included in the surface dressing programme are:

Some diversion routes and road closures will be in place, with warning signs in advance of any works. All details are listed on one.network.

Exit mobile version